ASSESSMENT OF ENERGY EFFICIENCY OF COMBINED CYCLE POWER PLANT (CASE STUDY: COMBINED CYCLE POWER PLANT IN PRIOK)
Saved in:
Main Author: | Ruriandi, Hendrastantyo |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/59832 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)
by: RURIANDI (NIM : 13111072), HENDRASTANTYO -
AUDIT OF ENERGY EFFICIENCY OF COMBINED CYCLE POWER PLANT (CASE STUDY: COMBINED CYCLE POWER PLANT IN PRIOK).
by: Stenvil Woran, Hany -
OPERATIONAL RISK ANALYSIS OF COMBINED CYCLE POWER PLANT TANJUNG PRIOK
by: Rachman Wijaya, Fauzi -
MODELLING AND CONTROL SYSTEM DESIGN TANJUNG PRIOK COMBINED CYCLE POWER PLANT
by: CAHYONO (NIM:23108315); Pembimbing : DR. Ir. Indrawanto, HARI -
LIFE CYCLE ASSESSMENT STUDY OF COMBINED CYCLE POWER PLANT IN NORTH JAKARTA
by: Ari Ruwaedi, Muhammad