PERANCANGAN PLTP DENGAN PEMANFAATAN UAP BERLEBIH STUDI KASUS PT. INDONESIA POWER UBP KAMOJANG
Saved in:
Main Author: | Mochamad Iqbal, Riza |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60820 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF GEOTHERMAL POWER PLANT UTILIZING EXCEES STEAM CASE STUDY PT INDONESIA POWER UBP KAMOJANG
by: MOCHAMAD IQBAL (NIM : 131 06 114); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, RIZA -
REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM
by: Syafarianto (NIM 291 04 327), Arief -
OPTIMASI SISTEM EKSTRASI GAS PLTP KAMOJANG UNIT 2
by: Krisna Dana Putra, Arief -
PERANCANGAN SISTEM OTOMASI PADA SISTEM PENGKABUTAN BAHAN BAKAR DI PEMBANGKIT LISTRIK TENAGA GAS/UAP (STUDI KASUS DI UBP SEMARANG, PT INDONESIA POWER)
by: , RIFQI DWI PRABOWO, et al.
Published: (2013) -
UTILIZATION STUDY OF EXCESS STEAM FROM VENT VALVE IN PLTP KAMOJANG
by: Sundari, Putri