EXTERNAL DISRUPTIONS IMPACT MEASUREMENT IN ORDER TO ESTABLISH BUSINESS CONTINUITY MANAGEMENT SYSTEM (BCMS) IN PT EPCC INDONESIA
In this VUCA (Volatility, Uncertainty, Complexity, Ambiguity) era, many external factors that can interfere with company's going concern, this also happens at PT EPCC Indonesia, where company often experience losses from external changes that happening outside the company. To mitigate this kind...
Saved in:
Main Author: | Adela, Faiz |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60936 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF CONTRACTORâS VALUE ENGINEERING IMPLEMENTATION MEASUREMENT MODEL (APPLICATION OF THE MODEL IN THE EPCC PROJECT OF CONTRACTOR PT.X)
by: Ng, Andrew -
PERFORMANCE EVALUATION OF PROJECT MANAGEMENT USING SYSTEM DYNAMIC APPROACH, CASE STUDY: THE EPCC LNG FILLING STATION CARGO DOCK PROJECT
by: Candra, Maulani -
Impacts of climate change on shipping and business continuity management
by: Tan, Angeline Xiang Ying.
Published: (2012) -
Impacts of climate change on shipping and business continuity management
by: Pang, Qi Jun
Published: (2012) -
Impacts of climate change on shipping and business continuity management
by: Huang, Lulu.
Published: (2012)