MINIMIZING PROJECT COMPLETION DELAYS AND OPERATIONAL COST (A CASE STUDY: PT. BINA KARYA (PERSERO) PROJECT)
The construction industry has become a contributor to Indonesia's economic growth (BPS, 2021), although, during the current pandemic, the development of the construction industry is relatively stable and is expected to grow on a global scale in the coming years (McKinsey, 2020). To increased ec...
Saved in:
Main Author: | Noviansyah, Angga |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61297 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MINIMIZING DELAY TIME OF PROJECT COMPLETION (CASE OF PT.ANXX)
by: Eka Putra, Kaizman -
MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)
by: Khaerunnisa, Soraya -
PLANNING AND STRATEGY DEVELOPMENT FOR PROJECT COMPLETION ASSURANCE IMPROVEMENT (CASE STUDY: LAND HANDOVER PROJECT IN PT CPAC INDONESIA)
by: Surya, Angga -
ANALYSIS OF FACTORS CAUSING DELAYS IN IMPLEMENTATION OF THE HIGH RISE BUILDING CONSTRUCTION PROJECT AT PT. HUTAMA KARYA (PERSERO)
by: Bogo Yustanto, Kurniawan -
THE ANALYSIS OF PROJECT COMPLETION DELAY ALONG WITH THE RECOMMENDATION OF THE SYSTEM AND PROCEDURE TO HANDLE IT AT PT. Z (CASE STUDY: CRUSHER MASTER PLAN PROJECT)
by: ULYA HIDAYAT (NIM: 29107144), AKHMAD