ENGINEERING CRITICAL ASSESSMENT SUBMARINE PIPE INSTALLATION WITH S-LAY METHOD
Submarine pipe joints (girth welds) are an area that is likely to experience defects. The defect has the potential to cause stress concentrations, so that the initial crack will occur. These cracks will spread out due to the cyclic loads that the structure receives. This study was conducted to evalu...
Saved in:
Main Author: | Frestiqauli, Santi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/61722 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LEGAL AND TECHNICAL ASPECTS OF SUBMARINE CABLES INSTALLATION IN SUPPORTING MARINE SPATIAL PLANNING IN INDONESIA
by: Anindiya Sa'badini, Sarah -
STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG
by: Falah Aryasatya, Muhammad -
METOCEAN STUDY FOR SUBMARINE PIPELINE MAINTENANCE
by: Arissaputra N, Deni -
Analysis of Tensile Strength of Bamboo Fiber Composites Made by Hand Lay Up Manufacturing Method
by: Subianto, Nicki -
Pipe Stress Analysis of Geothermal Pipeline System
by: Muhammad Taufik, Riko