INVESTMENT ANALYSIS OF TOBELO POWERPLANT 30 MW PROJECT IN HALMAHERA ISLAND SYSTEM
PT. PLN (Persero), as the state-owned company who responsible for electrification in Indonesia, has one major challenge to develop an electrical system in North Maluku. It lacks power capacity and reserve margin, causing system deficit and unreliable. Otherwise, the current generating cost from t...
Saved in:
Main Author: | Aditya Primanto, Irfan |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62702 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BAWEAN ISLAND 5 MW POWERPLANT PROJECT INVESTMENT ANALYSIS
by: Wied Hardono, Luddie -
INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB)
by: Arief Rachman, M -
INVESTMENT ANALYSIS FOR SUBMARINE POWER CABLE PROJECT BETWEEN BELAKANG PADANG ISLAND AND SAMBU ISLAND
by: Wibowo, Agus -
INVESTMENT PROJECT ANALYSIS OF 120 MW COMBINED CYCLE POWER PLANT (CCPP) IN BATAM (CASE STUDY OF PT PLNB)
by: Yuli Anggoro, Andryas -
INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
by: Sihwan Abdullah, Muhammad