THE IMPLEMENTATION OF SCHEDULE AND PROJECT TRACKING (CASE STUDY: PT DAYA KOMUNIKASI)
The restriction of all activities comes with the existence of pandemic COVID 19, the importance of internet connectivity was becoming apparent as all activities were conducted remotely. To ensure internet connection quality, the government planned to build BTS towers in various spots in Indonesia. A...
Saved in:
Main Author: | Ansley, Angela |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/62919 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SCHEDULE RISK ANALYSIS OF DESIGN BUILD PROJECTS STUDY CASE : PROJECT APMS PT. ANGKASA PURA II CENGKARENG
by: ARDISA, HANS -
IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)
by: Putu Indra Gunawan, Sang -
OPTIMIZING FSTP MANAGEMENT THROUGH IMPLEMENTATION OF SCHEDULED FAECAL SLUDGE SERVICES (SFSS) ( CASE STUDY : SUWUNG FSTP AND KUTA DISTRICT,BALI)
by: Deviliana S, Angela -
RISK MANAGEMENT IMPLEMENTATION FOR CONSTRUCTION PROJECTS: A CASE STUDY OF PT PANTRAYA
by: Nadianaputri, Marsha -
DESIGN OF CONSTRUCTION IMPLEMENTATION METHODS, SCHEDULING, AND ESTIMATION OF CONSTRUCTION COSTS PROJECT BALIKPAPAN FOOTBALL STADION PROJECT
by: Fadhli Mubarak, Muhammad