DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY

Abstract: Loa Bakung Integrated Waste Processing Site (TPST) Loa Bakung is located at Jl. Jakarta, Loa Bakung Sub-district, Sungai Kunjang District, Samarinda City. TPST Loa Bakung has area of 860.25 m2. Waste management in TPST Loa Bakung is running poorly and not optimally. There are abandoned fac...

Full description

Saved in:
Bibliographic Details
Main Author: Shafira Putri, Yozy
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/64029
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:64029
spelling id-itb.:640292022-03-28T08:25:18ZDESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY Shafira Putri, Yozy Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project planning; handling; processing; design; TPST. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64029 Abstract: Loa Bakung Integrated Waste Processing Site (TPST) Loa Bakung is located at Jl. Jakarta, Loa Bakung Sub-district, Sungai Kunjang District, Samarinda City. TPST Loa Bakung has area of 860.25 m2. Waste management in TPST Loa Bakung is running poorly and not optimally. There are abandoned facilities, inadequate supporting facilities, and not optimal waste process. The service area of TPST Loa Bakung includes 56 RT from 83 RT in Loa Bakung sub-district. From sampling results, waste generation of TPST Loa Bakung is 0.26 kg/person/day by mass or 2.69 liter/person/day by volume. TPST Loa Bakung is planned to have facilities for sorting areas, processing organic waste, handling inorganic waste, and handling residual waste. At the end of the operational year, which is 2033, TPST Loa Bakung is planned to have a capacity of 5,500 kg/day. Sorting is done manually with the help of conveyor belt. inorganic waste that is sorted are paper, recycleable plastics, glass and metal, with a total waste generation of 843 kg/day. Segregated inorganic waste will be sold to third parties. The organic waste that will be processed is 1,734 kg/day, processed with open windrow composting technology. Untreated waste and other residues will be put into 6 m3 containers and transported to landfill by arm roll truck twice per day. Based on the calculation of the Net Present Value, if the compost sold is 60% of the total compost produced, then the NPV value obtained is greater than 0 or has a positive value, with a value of Rp. 1,278,897,610.77. From the NPV value, the design of capacity building of TPST Loa Bakung can be said to be economically feasible and can operate independently, with an annual waste processing profit of Rp. 168,894.12/ton. The design of this capacity building will reduce carbon dioxide emissions by 44.9%. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik saniter dan perkotaan; teknik perlindungan lingkungan
spellingShingle Teknik saniter dan perkotaan; teknik perlindungan lingkungan
Shafira Putri, Yozy
DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY
description Abstract: Loa Bakung Integrated Waste Processing Site (TPST) Loa Bakung is located at Jl. Jakarta, Loa Bakung Sub-district, Sungai Kunjang District, Samarinda City. TPST Loa Bakung has area of 860.25 m2. Waste management in TPST Loa Bakung is running poorly and not optimally. There are abandoned facilities, inadequate supporting facilities, and not optimal waste process. The service area of TPST Loa Bakung includes 56 RT from 83 RT in Loa Bakung sub-district. From sampling results, waste generation of TPST Loa Bakung is 0.26 kg/person/day by mass or 2.69 liter/person/day by volume. TPST Loa Bakung is planned to have facilities for sorting areas, processing organic waste, handling inorganic waste, and handling residual waste. At the end of the operational year, which is 2033, TPST Loa Bakung is planned to have a capacity of 5,500 kg/day. Sorting is done manually with the help of conveyor belt. inorganic waste that is sorted are paper, recycleable plastics, glass and metal, with a total waste generation of 843 kg/day. Segregated inorganic waste will be sold to third parties. The organic waste that will be processed is 1,734 kg/day, processed with open windrow composting technology. Untreated waste and other residues will be put into 6 m3 containers and transported to landfill by arm roll truck twice per day. Based on the calculation of the Net Present Value, if the compost sold is 60% of the total compost produced, then the NPV value obtained is greater than 0 or has a positive value, with a value of Rp. 1,278,897,610.77. From the NPV value, the design of capacity building of TPST Loa Bakung can be said to be economically feasible and can operate independently, with an annual waste processing profit of Rp. 168,894.12/ton. The design of this capacity building will reduce carbon dioxide emissions by 44.9%.
format Final Project
author Shafira Putri, Yozy
author_facet Shafira Putri, Yozy
author_sort Shafira Putri, Yozy
title DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY
title_short DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY
title_full DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY
title_fullStr DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY
title_full_unstemmed DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY
title_sort design of capacity building of integrated waste treatment plant (tpst) loa bakung samarinda city
url https://digilib.itb.ac.id/gdl/view/64029
_version_ 1822004451594993664