DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY
Abstract: Loa Bakung Integrated Waste Processing Site (TPST) Loa Bakung is located at Jl. Jakarta, Loa Bakung Sub-district, Sungai Kunjang District, Samarinda City. TPST Loa Bakung has area of 860.25 m2. Waste management in TPST Loa Bakung is running poorly and not optimally. There are abandoned fac...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64029 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |