DESIGN OF CAPACITY BUILDING OF INTEGRATED WASTE TREATMENT PLANT (TPST) LOA BAKUNG SAMARINDA CITY
Abstract: Loa Bakung Integrated Waste Processing Site (TPST) Loa Bakung is located at Jl. Jakarta, Loa Bakung Sub-district, Sungai Kunjang District, Samarinda City. TPST Loa Bakung has area of 860.25 m2. Waste management in TPST Loa Bakung is running poorly and not optimally. There are abandoned fac...
Saved in:
Main Author: | Shafira Putri, Yozy |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64029 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF INTEGRATED WASTE TREATMENT PLANT (TPST) IN REGOL DISTRICT, BANDUNG CITY
by: Husni Nurulloh, Rizal -
DRAINAGE SYSTEM PLANNING FOR FLOOD MITIGATION DEVELOPMENT AT SAMARINDA ULU DISTRICT, SAMARINDA
by: Arief R, Maulana -
REDESIGN TEMPAT PENAMPUNGAN SEMENTARA (TPS) MENJADI TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) DI KOTA CIMAHI
by: Nurachmad Artama, Aldiza -
ANALYSIS FACTORS AFFECTING ILLEGAL DUMPING (CASE STUDY: SAMARINDA CITY)
by: Faradilla, Rahmahtriananda -
DESIGN OF INTAKE BUILDING, COAGULATION, FLOCULATION AND SEDIMENTATION UNIT AT PINTU AIR SEPULUH WATER TREATMENT PLANT TANGERANG CITY
by: Eka Putri, Devyandra