IMPROVEMENT OF ENERGY CONSUMPTION IN COMPLIANCE TO ISO 50001 ENERGY MANAGEMENT SYSTEMS (CASE STUDY LIGHTING SYSTEMS AT PT BADAK NGL)
The Badak LNG plant in Bontang Kalimantan Timur, Indonesia has been operating since 1974. By operating a 47 year old LNG plant and the technology used in natural gas liquefaction is relatively outdated, it will result in a decrease in performance and efficiency, which in turn will result in the B...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/64622 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |
成為第一個發表評論!