PROPOSED KNOWLEDGE MANAGEMENT SYSTEM AT PT DAYA ASESMEN INDONESIA TO OVERCOME DELAYS IN ELECTRICAL ASSESSMENT PROJECTS
Modern electrical systems are needed to deliver electricity not just reliably, efficiently, and appropriately, but also with high quality standards. Recent technological advancements have boosted the utilization of non-linear loads in electrical systems of various sizes. The limited number of ele...
Saved in:
Main Author: | Abdillah, Rizelfi |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/68785 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
A PROPOSED KNOWLEDGE MANAGEMENT SYSTEM TO OVERCOME PROJECT DELIVERY DELAY FOR A CONSULTING FIRM, CASE OF PT BDO KONSULTAN INDONESIA
by: Ayu Putri, Claudia -
A PROPOSED KNOWLEDGE MANAGEMENT SYSTEM TO OVERCOME SHIP PROJECT DELIVERY DELAY FOR A STATE-OWNED ENTERPRISE COMPANY (CASE STUDY: PT PERTAMINA TRANS KONTINENTAL)
by: Emmission Siringoringo, Mezbah -
PROPOSED PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK) IMPLEMENTATION IN PT PERTAMINA HULU ENERGI FIELD SIAK-KAMPAR PROJECTS
by: Abdillah Wiguna, Muhammad -
Project management knowledge and skills for green construction: Overcoming challenges
by: Hwang, B.-G., et al.
Published: (2013) -
PROPOSED IMPROVEMENTS TO FINISH THE DELAYED PROJECT OF PT ETS
by: Raditya Dwiprasta, Muhammad