TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA

PT. Geo Dipa Energi has a plan to optimize the Dieng unit's operations and achieve the installed capacity about 60 MW for Unit-1. To achieve the targets that have been planned, PT. Geo Dipa Energi conducted a program with Surface Facilities in the HCE 9B well. Front end engineering design (FEED...

Full description

Saved in:
Bibliographic Details
Main Author: Alvin, Leonard
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/71487
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:71487
spelling id-itb.:714872023-02-10T08:49:49ZTECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA Alvin, Leonard Indonesia Theses Dieng, Front-End Engineering Design, SAGS, Feasibility Study. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/71487 PT. Geo Dipa Energi has a plan to optimize the Dieng unit's operations and achieve the installed capacity about 60 MW for Unit-1. To achieve the targets that have been planned, PT. Geo Dipa Energi conducted a program with Surface Facilities in the HCE 9B well. Front end engineering design (FEED) is a crucial phase in engineering design. The goal of doing a FEED is to minimize significant changes during the construction phase. The achievement of this activity was to demonstrate the work of the front-end engineering design (FEED) is proposing a design solution for the steam above ground system (SAGS) at the Dieng Unit-1 geothermal area. The FEED methodology is based on equipments design for example piping systems, separator, silencer, cooling ponds, pumps, and finally economic analysis . FEED's work on the steam above ground system (SAGS) in the geothermal area contains the wellhead facility system to the steam pipe transmission. The SAGS technical design will be determined the result of the activity. As a recommendation to improve the results of this activity, activities must cover subsystems and make use of the software in their modeling as HYSYS V8.8. The results of the analysis show that the HCE 9B well generates 6.33 MW. Every equipment that has been designed will be calculated for its economic aspects to validate the feasibility of the project. It was recorded that the initial investment needed was around IDR 40.5 billion. Based on these figures compared to total revenue, the payback period (BEP) is calculated for 10 months, so this project is attractive and feasible to run. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT. Geo Dipa Energi has a plan to optimize the Dieng unit's operations and achieve the installed capacity about 60 MW for Unit-1. To achieve the targets that have been planned, PT. Geo Dipa Energi conducted a program with Surface Facilities in the HCE 9B well. Front end engineering design (FEED) is a crucial phase in engineering design. The goal of doing a FEED is to minimize significant changes during the construction phase. The achievement of this activity was to demonstrate the work of the front-end engineering design (FEED) is proposing a design solution for the steam above ground system (SAGS) at the Dieng Unit-1 geothermal area. The FEED methodology is based on equipments design for example piping systems, separator, silencer, cooling ponds, pumps, and finally economic analysis . FEED's work on the steam above ground system (SAGS) in the geothermal area contains the wellhead facility system to the steam pipe transmission. The SAGS technical design will be determined the result of the activity. As a recommendation to improve the results of this activity, activities must cover subsystems and make use of the software in their modeling as HYSYS V8.8. The results of the analysis show that the HCE 9B well generates 6.33 MW. Every equipment that has been designed will be calculated for its economic aspects to validate the feasibility of the project. It was recorded that the initial investment needed was around IDR 40.5 billion. Based on these figures compared to total revenue, the payback period (BEP) is calculated for 10 months, so this project is attractive and feasible to run.
format Theses
author Alvin, Leonard
spellingShingle Alvin, Leonard
TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
author_facet Alvin, Leonard
author_sort Alvin, Leonard
title TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
title_short TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
title_full TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
title_fullStr TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
title_full_unstemmed TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
title_sort technical & financial study and front end engineering design (feed)production facilities for well hce 9b dieng area
url https://digilib.itb.ac.id/gdl/view/71487
_version_ 1822992158520508416