TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA

PT. Geo Dipa Energi has a plan to optimize the Dieng unit's operations and achieve the installed capacity about 60 MW for Unit-1. To achieve the targets that have been planned, PT. Geo Dipa Energi conducted a program with Surface Facilities in the HCE 9B well. Front end engineering design (FEED...

Full description

Saved in:
Bibliographic Details
Main Author: Alvin, Leonard
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/71487
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first