TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
PT. Geo Dipa Energi has a plan to optimize the Dieng unit's operations and achieve the installed capacity about 60 MW for Unit-1. To achieve the targets that have been planned, PT. Geo Dipa Energi conducted a program with Surface Facilities in the HCE 9B well. Front end engineering design (FEED...
Saved in:
Main Author: | Alvin, Leonard |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/71487 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDI MINERAL ALTERASI HIDROTERMAL LAPANGAN PANAS BUMI DIENG STUDI KASUS SUMUR, HCE-30, HCE-30A, HCE-31DAN HCE-28A
by: Candraditya, Lantip -
FRONT-END ENGINEERING DESIGN OF PAD 28 GEOTHERMAL BRINE INJECTION FACILITY
by: Vieri M Situmorang, Peregrinus -
History of Computing and Education 3 (Hce3)
Published: (2017) -
DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
by: BHAKTI ARIFMAN , ANDY -
Clinical Study of the Ginko biloba - Troxerutin-Heptaminol Hce in the Treatment of Acute Hemorrhoidal Attacks
by: Kanit Sumboonnanonda, et al.
Published: (2018)