TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
PT. Geo Dipa Energi has a plan to optimize the Dieng unit's operations and achieve the installed capacity about 60 MW for Unit-1. To achieve the targets that have been planned, PT. Geo Dipa Energi conducted a program with Surface Facilities in the HCE 9B well. Front end engineering design (FEED...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/71487 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |