STUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA

Productivity is the ability of a mining parameter to carry out production at any certain time. We can qualify that productivity are well-practiced when the production achieved or even beyond the target. PT Macmahon Mining Service has a different method which could gives a huge impact on productio...

Full description

Saved in:
Bibliographic Details
Main Author: Yusrin, Salman
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/72163
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:72163
spelling id-itb.:721632023-03-06T11:09:15ZSTUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA Yusrin, Salman Indonesia Final Project Split dump, Productivity, Match factor, Configuration Fleet INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/72163 Productivity is the ability of a mining parameter to carry out production at any certain time. We can qualify that productivity are well-practiced when the production achieved or even beyond the target. PT Macmahon Mining Service has a different method which could gives a huge impact on production which is called split dump. The split dump method is a method where one loading point distributed material to various disposal points at the same time. Split dump method that performed at the Martabe Gold Mine still has disadvantage. Means the production still not achieved. It happened because the fleet configuration still does not have the guideline as a comparation. Therefore, research is needed regarding the split dump. This research use Burt and Caccetta’s split dump formula, where it can be optimized linear and nonlinear programming. Linear and non-linear programs implemented using solver adds-in on Microsoft Excel. Based on the studies that have been conducted, an ideal configuration can increase productivity and will produce a good match factor value. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Productivity is the ability of a mining parameter to carry out production at any certain time. We can qualify that productivity are well-practiced when the production achieved or even beyond the target. PT Macmahon Mining Service has a different method which could gives a huge impact on production which is called split dump. The split dump method is a method where one loading point distributed material to various disposal points at the same time. Split dump method that performed at the Martabe Gold Mine still has disadvantage. Means the production still not achieved. It happened because the fleet configuration still does not have the guideline as a comparation. Therefore, research is needed regarding the split dump. This research use Burt and Caccetta’s split dump formula, where it can be optimized linear and nonlinear programming. Linear and non-linear programs implemented using solver adds-in on Microsoft Excel. Based on the studies that have been conducted, an ideal configuration can increase productivity and will produce a good match factor value.
format Final Project
author Yusrin, Salman
spellingShingle Yusrin, Salman
STUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA
author_facet Yusrin, Salman
author_sort Yusrin, Salman
title STUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA
title_short STUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA
title_full STUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA
title_fullStr STUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA
title_full_unstemmed STUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA
title_sort study optimation productivity on event split dump pit purnama, martabe gold mine, sumatera utara
url https://digilib.itb.ac.id/gdl/view/72163
_version_ 1822992459029807104