STUDY OPTIMATION PRODUCTIVITY ON EVENT SPLIT DUMP PIT PURNAMA, MARTABE GOLD MINE, SUMATERA UTARA
Productivity is the ability of a mining parameter to carry out production at any certain time. We can qualify that productivity are well-practiced when the production achieved or even beyond the target. PT Macmahon Mining Service has a different method which could gives a huge impact on productio...
Saved in:
Main Author: | Yusrin, Salman |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/72163 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF HIGH-SULFIDATION EPITHERMAL DEPOSITS AT RAMBA JORING PIT, MARTABE GOLD MINE, SOUTH TAPANULI, NORTH SUMATRA
by: Dhimas Ario D, Dominicus -
INFLUENCE OF BLAST HOLE DIAMETER ON DRILL AND BLAST PERFORMANCE IN ADVANCED ARGILIC ALTERATION JOBSITE MARTABE GOLD MINE, SOUTH TAPANULI, NORTH SUMATERA
by: Rachmanda Akbar, Fikri -
HYDROGEOLOGICAL MODELLING FOR GROUNDWATER MANAGEMENT PLANNING IN PURNAMA PIT, PT. AGINCOURT RESOURCES, SUMATRA UTARA
by: Fauziyyah - Nim: 22715003 , Fithriyani -
STABILITY ANALYSIS OF IN-PIT DUMP SLOPE AT PT BARA ANUGRAH SEJAHTERA COAL MINING MUARA ENIM, SOUTH SUMATERA
by: Piqri Ardiansyah, Muhammad -
ALTERASI DAN MINERALISASI SULFIDA PROSPEK X, TAMBANG EMAS MARTABE, BATANGTORU, TAPANULI SELATAN, SUMATERA UTARA
by: Canggara, Himerius