PROPOSED PROJECT MANAGEMENT MATURITY: STUDY CASE PT. WASTERINDO MANUFAKTUR INDONESIA
PT. Wasterindo Manufaktur Indonesia (WMI) experienced several issues related to delivery project of the product Incinerator. The issues occurred mainly resulted in the project delay and cost overruns, which potentially impacted negatively to the project success. A company performance of running proj...
Saved in:
Main Author: | Adrian W, Tigas |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/75556 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSED PROJECT MANAGEMENT PLANNING DEVELOPMENT FOR PT APS INDONESIA
by: Movita Fitriana, Tiwi -
PROPOSED PROJECT MANAGEMENT SYSTEM FOR PT XYZ
by: Satiamulyana, Ardi -
IMPROVEMENT OF PROJECT PERFORMANCE THROUGH WELL CANDIDATES MATURATION ANALYSIS(A PROJECT MANAGEMENT CASE STUDY OF NESSA FIELD)
by: Hadi Harnianto, Syamsul -
PROPOSED BUSINESS STRATEGY IMPROVEMENT FOR PROJECT MANAGEMENT CONSULTING FIRM (STUDY CASE: PT ABC)
by: Matrox Tamimi, Joshua -
PROPOSED SOLUTION TO IMPROVE PROJECT MANAGEMENT PERFORMANCE IN PT XYZ CASE STUDY : PADANG GEOTHERMAL POWER PLAN PROJECT
by: Ismayanto, Doma