ANALYSIS OF MANAGEMENT AND FACTORS INFLUENCING THE BEHAVIORAL INTENTION OF NEAR MISS REPORTING IN GEOTHERMAL POWER PLANT (CASE STUDY: PT. X, BANDUNG REGENCY )
Geothermal Power Plant (PLTP) activities cannot be separated from the risk of work accidents. Near misses are the precursors of work accidents, therefore it is necessary to have awareness of workers in reporting incidents and proper management to prevent serious accidents in the future. This stud...
Saved in:
Main Author: | Atikah Hamdani, Shafira |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/76304 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RISK MANAGEMENT FOR SAFETY IN WELLPAD AND POWER PLANT AREAS OF GEOTHERMAL POWER PLANTS (PLTP X) USING THE HIRARC METHODE
by: Arif Yutaro Zoebar, Muhammad -
DESIGN OF COAGULATION, FLOCCULATION, AND SEDIMENTATION UNIT AT SADU WATER TREATMENT PLANT STAGE II, BANDUNG REGENCY
by: Fadhilezar, Almer -
DESIGN OF SEWERAGE AND WASTEWATER TREATMENT PLANT IN PT PERTAMINA GEOTHERMAL ENERGY AREA KAMOJANG
by: Rinaidi, Destria -
UTILIZATION OF AERMOD DISPERSION MODELLINGOFAMMONIA CONCENTRATION DISPERSION AT POINT SOURCES WITH A CASE STUDY OF COMPANY X FERTILIZER PLANT IN GRESIK REGENCY
by: Alexander, Edward -
DESIGN OF WATER TREATMENT PLANT (WTP) IN CIBULAKAN, GARUT REGENCY.
by: Affandi, Irvan