FINANCIAL IMPACT DUE TO DELAYS IN IMPLEMENTATION OF JAKARTA-BANDUNG HIGH-SPEED RAILWAY CONSTRUCTIONÂ PROJECT
Saved in:
Main Author: | Agneshia Putri, Ananda |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/76707 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SLOPE STABILITY ANALISYS OF JOINTED ROCK DUE TO BLASTING OF THE 4TH TUNNEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
by: Aditya, Fariz -
DYNAMIC SIMULATION OF BLASTING GROUND VIBRATION OF TUNNEL #4 JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT
by: Hafid Fahrudinsyah, Muhammad -
OPERATION AND MAINTENANCE STRATEGY FOR JAKARTA â BANDUNG HIGH SPEED RAILWAY
by: Su, Zemei -
PASSENGER SERVICE SATISFACTION EVALUATION OF JAKARTA-BANDUNG HIGH-SPEED RAILWAY
by: Shuyuan, Liu -
THE IMPACT OF JAKARTA-BANDUNG HIGH SPEED RAILWAY TEGALLUAR MEGAPROJECT ON LAND PRICE CHANGES USING HEDONIC PRICING MODEL METHOD
by: Maulidina Putri, Iffaty