IMPLEMENTATION OF REAL OPTION VALUATION (ROV) TRINOMIAL HULL-WHITE FOR MINE PLAN SCENARIOS UNDER THE PRICE UNCERTAINTY OF KSM NICKEL PROJECT
KSM nickel project was postponed from 2007 due to collapsing price caused by global financial crisis. The Base Case scenario has a potential reserve of 4,8 WMT and average Ni of 1.8%. It was obtained by utilizing maximum stripping ratio. However the management is considering re-evaluating this pr...
Saved in:
Main Author: | Alibasya, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77279 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Valuing Trinomial Option Pricing with Pseudoinverse Matrix
by: Abdurahman, Abdurakhman, et al.
Published: (2006) -
BINO-TRINOMIAL METHOD FOR PRICING BARRIER OPTION
by: DWI ISMANTO (NIM: 10114056), RIDO -
THE BINO-TRINOMIAL TREE MODEL FOR PRICING BARRIER OPTIONS AND THEIR APPLICATIONS
by: Aulia Rahayu, Rima -
EFFICIENT BOND OPTION PRICING METHOD UNDER HULL WHITE MODEL
by: GU XINHUI
Published: (2021) -
PRICING EMPLOYEE STOCK OPTIONS USING BINO-TRINOMIAL TREE MODEL
by: Daniel, Otaget