OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR

Based on “Filling the Gap” Campaign generated by SKK MIGAS, to achieve national Production Target, SKK MIGAS obligated Oil and Gas Operators in Indonesia, to expedites well onstream process, hence contributing more to annual cumulative national production target. PT. PETRO YELLOW STAR as one of larg...

Full description

Saved in:
Bibliographic Details
Main Author: Akbary, Fauzan
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/77453
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:77453
spelling id-itb.:774532023-09-06T09:23:48ZOPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR Akbary, Fauzan Indonesia Theses Project Construction Management, Surface Production Facilities, SMART method, Simultaneous Operation, Temporary Production Facilities, Innovation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/77453 Based on “Filling the Gap” Campaign generated by SKK MIGAS, to achieve national Production Target, SKK MIGAS obligated Oil and Gas Operators in Indonesia, to expedites well onstream process, hence contributing more to annual cumulative national production target. PT. PETRO YELLOW STAR as one of large oil and gas operator in Indonesia, requires average 12 weeks to produce 1 development well, from drilling, surface facilities installation, and well testing. Innovation to develop new method is raised by this concern to result faster production time. Group Discussion was held to generates new alternative(s) by creating criteria of how the new solution should be and brainstorming the possibilities based on literature review and experiences of subject matter experts. New alternatives have been developed in PT. PETRO YELLOW STAR to reduce surface facilities installation project time and can contributes to expediting well onstream process. Based on comparation with SMART Method, the new developed alternatives proofs to be the best options in concern of reducing well onstream time. However, not all condition could support the selection of this new alternative, and to adapt to the situation, sensitivity analysis conducted by changing the weight factor in SMART. Sensitivity analysis also conducted to compare among the available methods with different project condition and the result shows some limitation of condition that commonly faced would affect the selection results. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Based on “Filling the Gap” Campaign generated by SKK MIGAS, to achieve national Production Target, SKK MIGAS obligated Oil and Gas Operators in Indonesia, to expedites well onstream process, hence contributing more to annual cumulative national production target. PT. PETRO YELLOW STAR as one of large oil and gas operator in Indonesia, requires average 12 weeks to produce 1 development well, from drilling, surface facilities installation, and well testing. Innovation to develop new method is raised by this concern to result faster production time. Group Discussion was held to generates new alternative(s) by creating criteria of how the new solution should be and brainstorming the possibilities based on literature review and experiences of subject matter experts. New alternatives have been developed in PT. PETRO YELLOW STAR to reduce surface facilities installation project time and can contributes to expediting well onstream process. Based on comparation with SMART Method, the new developed alternatives proofs to be the best options in concern of reducing well onstream time. However, not all condition could support the selection of this new alternative, and to adapt to the situation, sensitivity analysis conducted by changing the weight factor in SMART. Sensitivity analysis also conducted to compare among the available methods with different project condition and the result shows some limitation of condition that commonly faced would affect the selection results.
format Theses
author Akbary, Fauzan
spellingShingle Akbary, Fauzan
OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR
author_facet Akbary, Fauzan
author_sort Akbary, Fauzan
title OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR
title_short OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR
title_full OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR
title_fullStr OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR
title_full_unstemmed OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR
title_sort optimizing well hook up project to expedite wellonstream time in pt. petro yellow star
url https://digilib.itb.ac.id/gdl/view/77453
_version_ 1822995351395631104