OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR
Based on “Filling the Gap” Campaign generated by SKK MIGAS, to achieve national Production Target, SKK MIGAS obligated Oil and Gas Operators in Indonesia, to expedites well onstream process, hence contributing more to annual cumulative national production target. PT. PETRO YELLOW STAR as one of larg...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77453 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |