OPTIMIZING WELL HOOK UP PROJECT TO EXPEDITE WELLONSTREAM TIME IN PT. PETRO YELLOW STAR

Based on “Filling the Gap” Campaign generated by SKK MIGAS, to achieve national Production Target, SKK MIGAS obligated Oil and Gas Operators in Indonesia, to expedites well onstream process, hence contributing more to annual cumulative national production target. PT. PETRO YELLOW STAR as one of larg...

Full description

Saved in:
Bibliographic Details
Main Author: Akbary, Fauzan
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/77453
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first