COST AND SCHEDULE RISK ANALYSIS FOR THE JAKARTA-BANDUNG HIGH SPEED RAILWAY SUBSECTION 3D PROJECT FROM THE PERSPECTIVE OF AN INDONESIAN CONTRACTOR
The Jakarta-Bandung High Speed Railway is a national strategic project built through cooperation between Indonesia and China to encourage the modernization of mass transportation, connectivity between the cities of Jakarta and Bandung, and regional development. Since this project is an EPC project,...
Saved in:
Main Author: | Raishania Amarin Gata, Tasya |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/78435 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TECHNOLOGY LANDSCAPE OF RAILWAY CONSTRUCTION EQUIPMENT ON INDONESIAN RAILWAY CONTRACTORS
by: Adryan Arif Farrosi, Muhamad -
RELIABILITY OF BEARING CAPACITY OF DRILLED SHAFTS FOUNDATION CASE STUDY OF JAKARTA-BANDUNG HIGH SPEED RAILWAY
by: RIANI, HELZA -
RISK MANAGEMENT OF CONSTRUCTION SAFETY WORKS ABOVE ACTIVE RAILWAY TRACKS (CASE STUDY: JAKARTA-BANDUNG HIGH-SPEED RAILWAY PROJECT, DK113)
by: Hartomo, Rezki -
FOREMAN PERFORMANCE MEASUREMENT BASED ON CONTRACTOR PERSPECTIVE IN THE FORM OF SATISFACTION LEVELCASE STUDY: BANDUNG CITY CONSTRUCTION PROJECT
by: Wilbert, Christopher -
DEVELOPMENT OF INDONESIAN CONTRACTORS' READINESS TOWARD LEAN CONSTRUCTION ASSESSMENT MODEL
by: AMRI ROZA, HENGKI