DESIGN OF STEAM WASH SYSTEM AND WELL MANEUVER ANALYSIS AS DEPOSITION PREVENTION METHOD ON GEOTHERMAL TURBINE
Saved in:
Main Author: | Zaid Ariadji, Bakhtiar |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81048 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
UTILIZATION OF LOW QUALITY STEAM WELL TO IMPROVE STEAM CAPACITY IN GEOTHERMAL POWERPLANT.
by: Armansyah Fauzi, Ahmad -
Geothermal Steam Turbine Design at Inlet Pressure of 6.5 Bar and Power of 63 MW
by: Nawawi, Achmad -
STUDI PEMANFAATAN DAN ANALISIS EKONOMI SIKLUS ALLAM SEBAGAI PEMBANGKIT LISTRIK TENAGA GAS DI INDONESIA
by: Zaid Ariadji, Bakhtiar -
A THEORETICAL APPROACH IN DETERMINATION OF THE EFFECT OF WELL CONFIGURATION ON PRODUCTION DECLINE OF DRY STEAM GEOTHERMAL WELL
by: Adam Farizi, Safrian -
DESIGN OF STEAM TURBINE EFFICIENCY MONITORING SYSTEM WITH DATA INFRASTRUCTURE
by: (13313019), Septian