PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ

Before conducting mining operations, mine planning is essentials to achieve the most optimal results. One of the components of mining planning is production scheduling. In this final project, several production scheduling scenarios were created and then investment analysis was performed for each sce...

Full description

Saved in:
Bibliographic Details
Main Author: Adinata, Adrian
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/85379
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Before conducting mining operations, mine planning is essentials to achieve the most optimal results. One of the components of mining planning is production scheduling. In this final project, several production scheduling scenarios were created and then investment analysis was performed for each scenario. The investment analysis was carried out on each scenario to determine the most optimal mining scenario, thereby maximizing profits. The data used in this study were obtained from secondary data at PT XYZ. It was found that the most optimal scenario to implement is the one with constant stripping ratio throughout the year, as it yields the highest profit in the investment analysis.