PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ
Before conducting mining operations, mine planning is essentials to achieve the most optimal results. One of the components of mining planning is production scheduling. In this final project, several production scheduling scenarios were created and then investment analysis was performed for each sce...
Saved in:
Main Author: | Adinata, Adrian |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85379 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZATION AND SCHEDULING OF OPEN PIT MINING IN LIMESTONE MINING AT PT XYZ IN SOUTH KALIMANTAN
by: Fitra Mulyadi, Fauzan -
OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
by: Usama -
TIN MINING PRODUCTION SCHEDULING IN PT XYZ
by: ANDHIA PUTRIE SUWANDI (NIM : 12114035), DHEA -
PIT OPTIMIZATION AND SCHEDULING COAL MINES PT XYZ
by: Adjie Pramudya, Danung -
STUDY OF OPEN PIT TIN MINE DESIGN OPTIMIZATION PT XYZ, BANGKA BELITUNG PROVINCE
by: Pauli Siahaan, Florencia