PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ

Before conducting mining operations, mine planning is essentials to achieve the most optimal results. One of the components of mining planning is production scheduling. In this final project, several production scheduling scenarios were created and then investment analysis was performed for each sce...

Full description

Saved in:
Bibliographic Details
Main Author: Adinata, Adrian
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/85379
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:85379
spelling id-itb.:853792024-08-20T11:56:34ZPRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ Adinata, Adrian Indonesia Final Project Production Scheduling, Production Scenarios, Investment Analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/85379 Before conducting mining operations, mine planning is essentials to achieve the most optimal results. One of the components of mining planning is production scheduling. In this final project, several production scheduling scenarios were created and then investment analysis was performed for each scenario. The investment analysis was carried out on each scenario to determine the most optimal mining scenario, thereby maximizing profits. The data used in this study were obtained from secondary data at PT XYZ. It was found that the most optimal scenario to implement is the one with constant stripping ratio throughout the year, as it yields the highest profit in the investment analysis. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Before conducting mining operations, mine planning is essentials to achieve the most optimal results. One of the components of mining planning is production scheduling. In this final project, several production scheduling scenarios were created and then investment analysis was performed for each scenario. The investment analysis was carried out on each scenario to determine the most optimal mining scenario, thereby maximizing profits. The data used in this study were obtained from secondary data at PT XYZ. It was found that the most optimal scenario to implement is the one with constant stripping ratio throughout the year, as it yields the highest profit in the investment analysis.
format Final Project
author Adinata, Adrian
spellingShingle Adinata, Adrian
PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ
author_facet Adinata, Adrian
author_sort Adinata, Adrian
title PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ
title_short PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ
title_full PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ
title_fullStr PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ
title_full_unstemmed PRODUCTION SCHEDULE PLANNING FOR OPEN PIT TIN MINING AT PT XYZ
title_sort production schedule planning for open pit tin mining at pt xyz
url https://digilib.itb.ac.id/gdl/view/85379
_version_ 1822999154205392896