ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE
Unit price contract system is one of contract system which often be used by owner in the construction project outline. Contractor as a field executants has responsibility for analyzing actual work of structure that had been done and work unit price too. Actual volume and work unit price analyzing ai...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/125214/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65379 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Summary: | Unit price contract system is one of contract system which often be used by
owner in the construction project outline. Contractor as a field executants has
responsibility for analyzing actual work of structure that had been done and work
unit price too.
Actual volume and work unit price analyzing aimed to get the real working
in the field by contractor and work unit price will become considering by owner for
paying of that real work.
The author directly in the field to practice landing an internship supervisor
and counting together all of the actual work volume by using Microsoft excel 2007
software.
From calculation analyzing, can be concluded that each actual work done
are for rebar, concretes, and framework are 193,95 ton, 1203,9 m3, and 1301,6 m2.
there is difference between actual work which doing by contractor in the field and
real cost estimate plan. |
---|