ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE

Unit price contract system is one of contract system which often be used by owner in the construction project outline. Contractor as a field executants has responsibility for analyzing actual work of structure that had been done and work unit price too. Actual volume and work unit price analyzing ai...

Full description

Saved in:
Bibliographic Details
Main Authors: , HENDRO, , Dr. Eng. Imam Haryanto, MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/125214/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65379
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Description
Summary:Unit price contract system is one of contract system which often be used by owner in the construction project outline. Contractor as a field executants has responsibility for analyzing actual work of structure that had been done and work unit price too. Actual volume and work unit price analyzing aimed to get the real working in the field by contractor and work unit price will become considering by owner for paying of that real work. The author directly in the field to practice landing an internship supervisor and counting together all of the actual work volume by using Microsoft excel 2007 software. From calculation analyzing, can be concluded that each actual work done are for rebar, concretes, and framework are 193,95 ton, 1203,9 m3, and 1301,6 m2. there is difference between actual work which doing by contractor in the field and real cost estimate plan.