ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE

Unit price contract system is one of contract system which often be used by owner in the construction project outline. Contractor as a field executants has responsibility for analyzing actual work of structure that had been done and work unit price too. Actual volume and work unit price analyzing ai...

Full description

Saved in:
Bibliographic Details
Main Authors: , HENDRO, , Dr. Eng. Imam Haryanto, MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/125214/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65379
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Be the first to leave a comment!
You must be logged in first