ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE

Unit price contract system is one of contract system which often be used by owner in the construction project outline. Contractor as a field executants has responsibility for analyzing actual work of structure that had been done and work unit price too. Actual volume and work unit price analyzing ai...

Full description

Saved in:
Bibliographic Details
Main Authors: , HENDRO, , Dr. Eng. Imam Haryanto, MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/125214/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65379
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.125214
record_format dspace
spelling id-ugm-repo.1252142016-03-04T08:38:29Z https://repository.ugm.ac.id/125214/ ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE , HENDRO , Dr. Eng. Imam Haryanto, MT. ETD Unit price contract system is one of contract system which often be used by owner in the construction project outline. Contractor as a field executants has responsibility for analyzing actual work of structure that had been done and work unit price too. Actual volume and work unit price analyzing aimed to get the real working in the field by contractor and work unit price will become considering by owner for paying of that real work. The author directly in the field to practice landing an internship supervisor and counting together all of the actual work volume by using Microsoft excel 2007 software. From calculation analyzing, can be concluded that each actual work done are for rebar, concretes, and framework are 193,95 ton, 1203,9 m3, and 1301,6 m2. there is difference between actual work which doing by contractor in the field and real cost estimate plan. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , HENDRO and , Dr. Eng. Imam Haryanto, MT. (2013) ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65379
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, HENDRO
, Dr. Eng. Imam Haryanto, MT.
ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE
description Unit price contract system is one of contract system which often be used by owner in the construction project outline. Contractor as a field executants has responsibility for analyzing actual work of structure that had been done and work unit price too. Actual volume and work unit price analyzing aimed to get the real working in the field by contractor and work unit price will become considering by owner for paying of that real work. The author directly in the field to practice landing an internship supervisor and counting together all of the actual work volume by using Microsoft excel 2007 software. From calculation analyzing, can be concluded that each actual work done are for rebar, concretes, and framework are 193,95 ton, 1203,9 m3, and 1301,6 m2. there is difference between actual work which doing by contractor in the field and real cost estimate plan.
format Theses and Dissertations
NonPeerReviewed
author , HENDRO
, Dr. Eng. Imam Haryanto, MT.
author_facet , HENDRO
, Dr. Eng. Imam Haryanto, MT.
author_sort , HENDRO
title ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE
title_short ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE
title_full ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE
title_fullStr ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE
title_full_unstemmed ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE
title_sort analisis volume aktual dan harga satuan pekerjaan struktur beton boiler foundation sistem kontrak unit price
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/125214/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65379
_version_ 1681232221518692352