ANALISIS VOLUME AKTUAL DAN HARGA SATUAN PEKERJAAN STRUKTUR BETON BOILER FOUNDATION SISTEM KONTRAK UNIT PRICE
Unit price contract system is one of contract system which often be used by owner in the construction project outline. Contractor as a field executants has responsibility for analyzing actual work of structure that had been done and work unit price too. Actual volume and work unit price analyzing ai...
Saved in:
Main Authors: | , HENDRO, , Dr. Eng. Imam Haryanto, MT. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/125214/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65379 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
KAJIAN TEKNIS DAN ANALISA HARGA SATUAN PEKERJAAN AKTUAL PEMASANGAN UNIT PRACETAK GELAGAR TIPE I BENTANG 40 METER Studi Kasus Proyek Peningkatan Jembatan Ironayan
by: , YOGI HANINDITO, et al.
Published: (2014) -
PEMAKAIAN DAYA LISTRIK AKTUAL DI PT. MITSUBISHI ELECTRIC AUTOMOTIVE INDONESIA
by: , TOYIB IMAM IBRAHIM, et al.
Published: (2014) -
Perilaku harga komoditas jagung dan kedelai di pasar aktual dan bursa komoditas
by: , KARIM, Akhmad Rizqul, et al.
Published: (2009) -
Konsep Variation Order Dalam Kontrak Konstruksi Pekerjaan Terintegrasi
by: Ryan Surya Pradhana
Published: (2020) -
PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO
DENGAN MENGGUNAKAN MICROSOFT PROJECT
by: , MEGHAN OCHTIANTY AAS, et al.
Published: (2014)