BIM-based scheduling for precast assembly and tower crane lifting
With the increasing popularity of Building Information Modelling (BIM) in the building and construction industry worldwide and the development of the precast industry, three issues have become significant. The first one is the path planning of the tower crane lifting of heavy precast. It is crucial...
Saved in:
Main Author: | Huang, Lihui |
---|---|
Other Authors: | Cai Yiyu |
Format: | Thesis-Doctor of Philosophy |
Language: | English |
Published: |
Nanyang Technological University
2021
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/152250 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
BIM4D-based scheduling for assembling and lifting in precast-enabled construction
by: Huang, Lihui, et al.
Published: (2022) -
Automatic re-planning of lifting paths for robotized tower cranes in dynamic BIM environments
by: Dutta, Souravik, et al.
Published: (2022) -
Intelligent lift motion planning for autonomous tower cranes in dynamic BIM environments
by: Dutta, Souravik
Published: (2022) -
Tower crane lifting
by: Loh, Weisong
Published: (2017) -
Effectiveness evaluation of smart crane system for precast building construction
by: Lee, Jong Won
Published: (2017)