Productivity aspects of bored piling operations in Singapore
This study describes a new productivity performance indicator for bored piling operations in Singapore. The study presents productivity performance measurement of 10 different piling projects in Singapore. These projects include commercial, industrial, residential and utility developments. These pil...
Saved in:
Main Authors: | Lee, Hong Keow., Khalid Mahmood. |
---|---|
Other Authors: | Alum, Jahidul |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19480 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Project management system on piling project (bored-cast-in-place pile)
by: Ng, Lay Hua.
Published: (2009) -
Bored piling practice in Singapore
by: Lim, You Swan.
Published: (2008) -
Productivity aspects of driven pile operations in Singapore
by: Hor, Puey Sheng.
Published: (2008) -
Evaluation of settlement of bored piles
by: Lee, Christopher Choon Sun.
Published: (2008) -
Behaviour of bored piles in residual soils and weathered rocks of Singapore
by: Chang, Ming Fang., et al.
Published: (2011)