Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line

This thesis is an example of how we can adopt a strategy to be cost competent in launching new Integrated Circuit (IC) packages in the market. On e is in an environment wherein the cost of manufacturing is far above and beyond many South East – Asian coutries especially in terms of manpower, materia...

Full description

Saved in:
Bibliographic Details
Main Author: Joseph Erasmo A. Galang
Other Authors: Ho, Yeong Khing
Format: Theses and Dissertations
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/4262
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Description
Summary:This thesis is an example of how we can adopt a strategy to be cost competent in launching new Integrated Circuit (IC) packages in the market. On e is in an environment wherein the cost of manufacturing is far above and beyond many South East – Asian coutries especially in terms of manpower, material or cost of producing the product.