Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line
This thesis is an example of how we can adopt a strategy to be cost competent in launching new Integrated Circuit (IC) packages in the market. On e is in an environment wherein the cost of manufacturing is far above and beyond many South East – Asian coutries especially in terms of manpower, materia...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/4262 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-4262 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-42622023-07-04T15:12:31Z Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line Joseph Erasmo A. Galang Ho, Yeong Khing School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Electronic packaging This thesis is an example of how we can adopt a strategy to be cost competent in launching new Integrated Circuit (IC) packages in the market. On e is in an environment wherein the cost of manufacturing is far above and beyond many South East – Asian coutries especially in terms of manpower, material or cost of producing the product. Master of Science (Computer Control and Automation) 2008-09-17T09:47:56Z 2008-09-17T09:47:56Z 2003 2003 Thesis http://hdl.handle.net/10356/4262 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Electrical and electronic engineering::Electronic packaging |
spellingShingle |
DRNTU::Engineering::Electrical and electronic engineering::Electronic packaging Joseph Erasmo A. Galang Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line |
description |
This thesis is an example of how we can adopt a strategy to be cost competent in launching new Integrated Circuit (IC) packages in the market. On e is in an environment wherein the cost of manufacturing is far above and beyond many South East – Asian coutries especially in terms of manpower, material or cost of producing the product. |
author2 |
Ho, Yeong Khing |
author_facet |
Ho, Yeong Khing Joseph Erasmo A. Galang |
format |
Theses and Dissertations |
author |
Joseph Erasmo A. Galang |
author_sort |
Joseph Erasmo A. Galang |
title |
Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line |
title_short |
Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line |
title_full |
Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line |
title_fullStr |
Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line |
title_full_unstemmed |
Automation of Ball Grid Array (BGA) intergrated circuit manufacturing line |
title_sort |
automation of ball grid array (bga) intergrated circuit manufacturing line |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/4262 |
_version_ |
1772828397304545280 |