A simulation-based analysis to improve line throughput for high-volume manufacturing
This project investigates a production line that faces fluctuating demand with seasonal pattern. The cumulative capacity exceeds the cumulative demand in a one year period; however, its expected weekly capacity is not able to meet the weekly demand during the peak season. In addition, examining its...
محفوظ في:
المؤلف الرئيسي: | Xia, Hua |
---|---|
مؤلفون آخرون: | Appa Iyer Sivakumar |
التنسيق: | Theses and Dissertations |
اللغة: | English |
منشور في: |
2014
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10356/60698 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Simulation as a productivity improvement tool in a component manufacturing line
بواسطة: Tan, Keng Hwee.
منشور في: (2009) -
Modeling the impact of Kanban design to cycle time, throughput and WIP in a high volume manufacturing system
بواسطة: Sio, Dhesirey Beryl Ko
منشور في: (2009) -
Simulation based analysis of cycle time and throughput in semiconductor assembly process integration
بواسطة: Muruhathasan Yogathasan.
منشور في: (2008) -
Performance improvement simulation of a manufacturing system
بواسطة: Liu, Haoyu
منشور في: (2014) -
A simulation study of a PC manufacturing line
بواسطة: Tham, Chee Yuen.
منشور في: (2009)