Yard crane scheduling with job arrival time uncertainties
Operation control in container terminals is always of great interest in the area of Computational Logistics and Operational Research. Yard Crane operations is an important step in the handling of containers and greatly impacts the efficiency of an entire terminal. During Yard Crane scheduling, the m...
Saved in:
Main Author: | Huang, Yixuan |
---|---|
Other Authors: | Huang Shell Ying |
Format: | Final Year Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/62629 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Handling arrival time uncertainties in yard crane dispatching to minimize job tardiness in container terminals
by: Seah, Sheng Kiat
Published: (2015) -
Handling arrival time uncertainties in yard crane dispatching to minimize job tardiness in container terminals
by: Li, Iemin
Published: (2014) -
A dynamic data driven optimization system for yard crane management
by: Guo, Xi.
Published: (2012) -
Twin crane scheduling with container reshuffling in container terminals
by: Lim, Ting Jie
Published: (2020) -
Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
by: Ong, Yi Long.
Published: (2013)