A heuristic algorithm to schedule twin yard crane to minimize job tardiness in container terminals
This project aims to reduce the job tardiness in container terminals. By implementing earliest deadline first algorithm in the Rubber Tyred Gantry (RTG) system, we hope to improve the current algorithm with additional method call look ahead. The main thing that look ahead does is to consider other u...
Saved in:
Main Author: | Wee, Benathon Yan Zhi |
---|---|
Other Authors: | Huang Shell Ying |
Format: | Final Year Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/62890 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
by: Chua, Jason Zhen Sheng
Published: (2014) -
Yard crane dispatching to minimize job tardiness in container terminals
by: Lim, Wei Lin.
Published: (2012) -
Handling arrival time uncertainties in yard crane dispatching to minimize job tardiness in container terminals
by: Seah, Sheng Kiat
Published: (2015) -
Embedding simulation in yard crane dispatching to minimize job tardiness in container terminals
by: Huang, Shell Ying, et al.
Published: (2013) -
Yard crane dispatching to minimize maximum tardiness of the jobs
by: Wan, Zhi Yong
Published: (2014)