Twin-crane cooperative scheduling in container terminals
To increase the productivity of the storage yard of a container terminal, two identical Yard Cranes are deployed in a Yard Block. The two Yard Cranes are unable to cross each other and must maintain safety distance at all times. During Yard Crane operation, the Yard Cranes may block each other in th...
Saved in:
Main Author: | Lee, Jason Chin Heng |
---|---|
Other Authors: | Huang Shell Ying |
Format: | Final Year Project |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/73979 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Twin crane scheduling with container reshuffling in container terminals
by: Lim, Ting Jie
Published: (2020) -
A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
by: Chua, Jason Zhen Sheng
Published: (2014) -
Quay crane scheduling in container terminals
by: Chan, Samson Yan Liang
Published: (2017) -
A heuristic algorithm to schedule twin yard crane to minimize job tardiness in container terminals
by: Wee, Benathon Yan Zhi
Published: (2015) -
Twin crane dispatching and scheduling algorithm
by: Luo, Yiming
Published: (2016)