An EScheduler-based data dependence analysis and task scheduling for parallel circuit simulation
The sparse matrix solver has become the bottleneck in a Simulation Program with Integrated Circuit Emphasis circuit simulator. It is difficult to parallelize the sparse matrix solver because of the high data dependence during the numerical LU factorization. In this brief, a para...
Saved in:
Main Authors: | , , , , |
---|---|
Other Authors: | |
Format: | Article |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/79643 http://hdl.handle.net/10220/8748 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |