Scheduling and control of start-up process for time-constrained single-arm cluster tools with parallel chambers
In wafer manufacturing, with the shrinking down of wafer lot size, cluster tools are frequently required to switch from handling one lot of wafers to another, resulting in more transient processes, including start-up and close-down processes. In the existing work, optimal scheduling of start-up proc...
Saved in:
Main Authors: | , , , , , , |
---|---|
Other Authors: | |
Format: | Article |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/90205 http://hdl.handle.net/10220/47191 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |