Modeling and optimal cyclic scheduling of time-constrained single-robot-arm cluster tools via Petri nets and linear programming
Scheduling a cluster tool with wafer residency time constraints is challenging and important in wafer manufacturing. With a backward strategy, the scheduling problem of such singlerobot-arm cluster tools is well-studied in the literature. It is much more challenging to schedule a more general case w...
Saved in:
Main Authors: | , , , , , |
---|---|
其他作者: | |
格式: | Article |
語言: | English |
出版: |
2020
|
主題: | |
在線閱讀: | https://hdl.handle.net/10356/139933 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|