Activity scheduling for a robotic caretaker agent for the elderly
A real-time robotic agent that takes care of an elderly person at home will need to schedule various tasks in real time. The deadlines of its tasks are generally soft (missing a deadline by a few minutes in most cases has no serious consequences). Another characteristic is that many tasks are pref...
Saved in:
Main Authors: | Zhang, Huiliang, Chang, Yuming, Huang, Shell Ying |
---|---|
Other Authors: | School of Computer Engineering |
Format: | Article |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/94269 http://hdl.handle.net/10220/7068 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
An agent's activities are controlled by his priorities
by: Huang, Shell Ying, et al.
Published: (2011) -
A general framework for parallel BDI agents in dynamic environments
by: Huang, Shell Ying, et al.
Published: (2011) -
Agent simulation of vessels traveling in sea
by: Zhang, Huiliang
Published: (2008) -
Elcie, an elderly care companion robot
by: Chang, Crystal Xuan Li
Published: (2019) -
A bounded two-level dynamic programming algorithm for quay crane scheduling in container terminals
by: Huang, Shell Ying, et al.
Published: (2018)