The work breakdown structure matrix: A tool to improve interface management
Master's
Saved in:
Main Author: | GODINOT MYRIAM YVONNE FRANCOISE |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/13811 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Language: | English |
Similar Items
-
Use of a WBS matrix to improve interface management in projects
by: Chua, D.K.H., et al.
Published: (2014) -
Streamlining execution of a remote pilot project
by: Colao, Ryan C.
Published: (2018) -
Vortex breakdown in an unconfined vortical flow
by: Khoo, B.C., et al.
Published: (2014) -
Managing lean projects: Understanding the structures of lean production
by: Tan, W.
Published: (2013) -
Gate Dielectric-Breakdown-Induced Microstructural Damage in MOSFETs
by: Tang, L.J., et al.
Published: (2014)