Parallel machine production and transportation operations' scheduling with tight time windows
10.1155/2020/1381340
Saved in:
Main Authors: | Jiang, Y., He, T., Xiong, J., Wu, X., Chen, Y. |
---|---|
Other Authors: | INDUSTRIAL SYSTEMS ENGINEERING AND MANAGEMENT |
Format: | Article |
Published: |
Hindawi Limited
2021
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/197335 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Unrelated parallel machine scheduling with setup times subject to job release and expired times
by: Chen, Changyu
Published: (2020) -
Airport Gate Scheduling with Time Windows
by: LIM, Andrew, et al.
Published: (2005) -
Manpower Scheduling with Time Windows
by: LIM, Andrew, et al.
Published: (2003) -
Multiobjective vehicle routing and scheduling problem with time window constraints in hazardous material transportation
by: Meng, Q., et al.
Published: (2014) -
Aircraft and Gate Scheduling with Time Windows
by: ZHU, Yi, et al.
Published: (2003)