DESIGN, CONSTRUCTION, AND TESTS OF TESLA TURBINE PROTOTYPE AS A TURBINE OF TOTAL FLOW SYSTEM IN GEOTHERMAL POWER PLANT
One system that is still being developed for Geothermal Power Plant is the <br /> <br /> <br /> total flow system. In this system, the number of geothermal utilities are <br /> <br /> <br /> minimized. This system needs a turbine that can operate in two-phase...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16311 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!