DESIGN, CONSTRUCTION, AND TESTS OF TESLA TURBINE PROTOTYPE AS A TURBINE OF TOTAL FLOW SYSTEM IN GEOTHERMAL POWER PLANT
One system that is still being developed for Geothermal Power Plant is the <br /> <br /> <br /> total flow system. In this system, the number of geothermal utilities are <br /> <br /> <br /> minimized. This system needs a turbine that can operate in two-phase...
Saved in:
Main Author: | ADI PRANANTO (NIM : 131 06 030); Dosen Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSM, LUKMAN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16311 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
by: ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG -
THERMODYNAMICS ANALYSIS OF DOUBLE FLASH CYCLE AT THE WAYANG WINDU UNIT 1 GEOTHERMAL POWER PLANT
by: WIRAWAN (NIM : 131 06 042); Dosen Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME , IRWAN -
DESIGN OF RADIAL INFLOW TURBINE FOR BINARY CYCLE IN LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 23110030); Tim Pembimbing : Prof. Dr. Ir. Aryadi Suwono; Dr. Ir. Ari D. Pasek; , JOAN -
GAS REMOVAL SYSTEM OPTIMIZATION IN KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT
by: KRISNA DANA PUTRA (NIM : 131 06 097); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, ARIEF -
DESIGN OF GEOTHERMAL POWER PLANT UTILIZING EXCEES STEAM CASE STUDY PT INDONESIA POWER UBP KAMOJANG
by: MOCHAMAD IQBAL (NIM : 131 06 114); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, RIZA